Our Customers

HP
HP
Johnson & Johnson
Johnson & Johnson
Nasa
Nasa
Tesla
Tesla
Google
Google
Yale University
Yale University
Intel
Intel
Charlotte University
Charlotte University
Harvard University
Harvard University
Ford
Ford
Applied Material
Applied Material
The Rockefeller University
The Rockefeller University
Spacex
Spacex
AMAZON
AMAZON

Pro Moves by Lab Pro

🧤 1. Pro Move: Never Let Gloves Be the Bottleneck
A medical device manufacturer ran out of sterile cleanroom gloves mid-batch. Lab Pro coordinated a same-day delivery within hours, eliminating contamination risk and keeping production on schedule.
🚚 2. Pro Move: 4:30 PM on a Friday Means Go Time
A customer faced a shutdown without a last-minute pallet of Xylene. Lab Pro mobilized an emergency delivery late Friday afternoon, ensuring operations continued through the weekend.
📦 3. Pro Move: Inventory You Don’t Have to Think About
Through its VMI program, Lab Pro identified critical stock levels before a shortage occurred. Inventory was replenished proactively, preventing downtime and removing the burden from the customer’s team.
⚠️ 4. Pro Move: HazMat Without the Headache
A regulated chemical with strict handling requirements was urgently needed. Lab Pro sourced, packaged, and delivered the material fully compliant with HazMat regulations, avoiding delays and risk.
🏭 5. Pro Move: One System, Three Sites, Total Control
A growing biotech company struggled with inconsistent inventory across multiple locations. Lab Pro implemented a unified VMI solution, improving visibility, reducing waste, and streamlining procurement.
🔄 6. Pro Move: Switching Suppliers Without Slowing Down
After experiencing delays from an existing supplier, a customer turned to Lab Pro. Equivalent products were sourced and delivered seamlessly, with no disruption to ongoing production.
🚀 7. Pro Move: Ready Before Day One
Ahead of a new production line launch, Lab Pro pre-staged all required cleanroom supplies and consumables, ensuring the customer was fully operational from day one.
📉 8. Pro Move: Less Inventory, More Efficiency
A customer carrying excess inventory worked with Lab Pro to optimize min/max levels. The result was reduced waste, improved cash flow, and a more efficient supply chain.
🧪 9. Pro Move: Chemicals That Work the Way You Do
Lab Pro provided custom chemical repack and private label solutions, delivering cleanroom-ready formats that improved safety, usability, and operational efficiency.
🏗️ 10. Pro Move: Cleanroom Ready, Right on Time
Facing a tight validation timeline, a customer needed critical cleanroom supplies fast. Lab Pro delivered all required materials on time, keeping the project on track.
💰 11. Pro Move: 20% Cost Savings on Full Consumables Bid
A customer requested a full lab consumables bid comparison. Lab Pro conducted a detailed SKU-by-SKU analysis, identifying equivalent or improved products and delivering over 20% total cost savings, plus reduced shipping expenses.
🚛 12. Pro Move: VMI That Cuts Shipping Costs by 10%
By consolidating orders through its VMI program, Lab Pro reduced fragmented shipments and emergency orders. The customer achieved an immediate 10% savings on shipping alone, while improving delivery consistency.
📊 13. Pro Move: Taking Inventory Headaches Off the Table
A customer struggling with stockouts and over-ordering partnered with Lab Pro to manage inventory. With Lab Pro owning min/max levels and forecasting, the customer eliminated internal inefficiencies and improved supply reliability.
Customers | LabPro Inc.